Hi Tbond, welcome to the forum Tony.
We are up in Bacnotan in La Union. Long story short we had an architect quote on a 6 ft high fence with timber gates and using only 4inch blocks and was slightly over P1M, that was 4 years ago and for me was over the top and also didn't include municipal and Barangay fees that we had to secure. We didn't proceed.
Long story.
2 years ago once we finalized our fence plan, double garage plan, a pump house (3M x 5), a 2 bed 3 bath, large lounge, verandahs etc etc. some 250M2 we went to the local Municipal office and spoke to the engineer and their draftsman about what we were planning, they offered to supply the plans, engineering and fees and was P 25K took a couple of months to complete. Ended up 27/8 K. 2 inspections were required for construction and plumbing and not booked, random and we have never had them visit in near 2 years.
Working in the building industry most of my life decided to manage it myself and the better half for bookwork/translating/buying/stock control etc.
We employed a lead mason, 2 masons and 6/7 labourers one of which also cooked their lunches and we supplied morning and afternoon snacks, before the main job started we had 4 guys here building the bunk house and kitchen with power and lights, there was an existing slab and CR from an old large kubo and we added more concrete, about 5 M x 8 M and enough to house 7 workers, later can be turned into a garage, we also brought all the bunk beds for them with 4 inch mattresses, a 10 cf refrigerator and gas cooker, that cost around P300K, many would stay on their day off and Ben told me they don't have a wife and what we supplied was better than where they live, look after your workers and they will look after you, we also paid them more than they would normally get on a construction site.
Any way the fence was first with the pump house, average height 2.4 M and 1.5 M in the ground so a fair lump of wall 100 M long. as per the earlier post was the construction method. My ever trusty book keeper said it cost a little over P 1.1 M including the matching and then a very nice S/S polished gate 5 M x 2.4 M on rollers and geared track and drive motor, a matching door for the pump house. This fence is rendered inside and out and 4 coats of paint.
The architects price never included painting and was 6 ft high and inferior construction, his consultancy/management fee for the fence was P 100K but included in his quote. that money for him to simply eyeballing effectively paid for 6 laborers and 2 masons for a months work If you have the experience and confidence you can manage it yourself and save pesos.
The extensions to the house of some 250+ M2 was another 4.6 M pesos and then 1.4 M on stand alone power so total to date 7.1 M.
Sorry for being long winded but I'm sure you get the drift, employ locals and manage them.
Cheers, Steve.