Quote:
Originally Posted by rmansoor
Hi Every one,
I have received the ACS result letter with positive skill assessment for 261313 (Software Engineer) under the ACS PIM 3 Group A.
Time line:
Applied online: 20th-August-2010
Case Finalized: 8th Oct 2010
Result Received(by post): 15th Oct 2010
Thanks a lot for all your support.
Now I am preparing for IELTS and waiting for Victorian state to declare their SOL.
Thanks,
Rehman
|
Congratulations for the positive assessment. Best of luck for IELTS. I am also waiting for the same 261313 (I hope they won't change it) code, I applied on 25-Aug and Registered Post Number is mentioned since last 4 days, but status of my application changed to 'case finalized' today. I have already appeared in IELTS on 9th Oct, result will be available on 22nd, lets hope for the best. Did you get your letter from traditional Postman? I think I should make Dosti with my Dakiya if that is the case.